p027
Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revisionNext revisionBoth sides next revision | ||
| p027 [2021/07/19 14:35] – created therblig | p027 [2021/07/19 17:38] – [FBG Provenance] therblig | ||
|---|---|---|---|
| Line 11: | Line 11: | ||
| ---- | ---- | ||
| - | This project was a tall concrete dam for power generation, on the Saranac River. | + | This project was a tall (55-foot) |
| + | |||
| + | An August 1904 ad in the //New York Sun// from FBG sought stone crushing services. Another ad [ER?], 7 Jan 1905, notes that the dam is 50 feet high and contains 10,000 cubic yards of concrete. | ||
| This is noted as a repeat order from engineer A.H. White; prior jobs have not been identified. | This is noted as a repeat order from engineer A.H. White; prior jobs have not been identified. | ||
| ==== FBG Provenance ==== | ==== FBG Provenance ==== | ||
| + | * Ad in // | ||
| + | * Ad in // | ||
| + | * [[notice1905 | FBG job listing notice, 7 Jan 1905 ]] | ||
| ==== Status ==== | ==== Status ==== | ||