| - | This project was a tall (55-foot) concrete dam for power generation, on the Saranac River. An ad from // | + | This project was a tall (55-foot) concrete dam for power generation, on the Saranac River. An ad from // |
| - | An August 1904 ad in the //New York Sun// from FBG sought stone crushing services. Another ad [ER?], 7 Jan 1905, notes that the dam is 50 feet high and contains 10,000 cubic yards of concrete. | + | FBG ads in several newspapers from August |
| This is noted as a repeat order from engineer A.H. White; prior jobs have not been identified. | This is noted as a repeat order from engineer A.H. White; prior jobs have not been identified. | ||
| Line 24: | Line 24: | ||
| ==== Status ==== | ==== Status ==== | ||
| * Standing and in original use (may not be producing hydropower although an apparently functional powerhouse, with power transmission cables, remains downstream). | * Standing and in original use (may not be producing hydropower although an apparently functional powerhouse, with power transmission cables, remains downstream). | ||
| - | * [[https:// | + | * [[https:// |
| ==== Clips ==== | ==== Clips ==== | ||
| + | * //Boston Evening Transcript//, | ||
| + | {{ : | ||
| + | |||
| + | * //Boston Globe//, 6 Oct 1904 (and other papers, earlier): | ||
| + | {{ : | ||
| + | |||
| * Ad in //System//, Nov 1907: | * Ad in //System//, Nov 1907: | ||
| - | {{ :: | + | {{ :: |
| + | |||
| + | *//Concrete System//, pp56 & 57. The lower photo is not a certain identification and may be another project. | ||
| + | {{ : | ||
| + | {{ : | ||