| p027 [2021/07/28 19:39] – therblig | p027 [2021/07/28 21:22] – therblig | ||
|---|---|---|---|
| Line 13: | Line 13: | ||
| This project was a tall (55-foot) concrete dam for power generation, on the Saranac River. An ad from // | This project was a tall (55-foot) concrete dam for power generation, on the Saranac River. An ad from // | ||
| - | An August 1904 ad in the //New York Sun// from FBG sought stone crushing services. Another ad [ER?], 7 Jan 1905, notes that the dam is 50 feet high and contains 10,000 cubic yards of concrete. | + | FBG ads in several newspapers from August |
| This is noted as a repeat order from engineer A.H. White; prior jobs have not been identified. | This is noted as a repeat order from engineer A.H. White; prior jobs have not been identified. | ||
| Line 29: | Line 29: | ||
| * //Boston Evening Transcript//, | * //Boston Evening Transcript//, | ||
| {{ : | {{ : | ||
| + | |||
| + | * //Boston Globe//, 6 Oct 1904 (and other papers, earlier): | ||
| + | {{ : | ||