 This project was a tall (55-foot) concrete dam for power generation, on the Saranac River. An ad from //Engineering News//, 28 Dec 1905, identifies the client as International Paper Co (along with two larger jobs for that company at Piercefield, NY and Berlin, NH). This project was a tall (55-foot) concrete dam for power generation, on the Saranac River. An ad from //Engineering News//, 28 Dec 1905, identifies the client as International Paper Co (along with two larger jobs for that company at Piercefield, NY and Berlin, NH).
  
-An August 1904 ad in the //New York Sun// from FBG sought stone crushing services. Another ad [ER?], 7 Jan 1905, notes that the dam is 50 feet high and contains 10,000 cubic yards of concrete.+FBG ads in several newspapers from August to October 1904 or so including the //New York Sun// from FBG sought stone crushing services. Another ad [ER?], 7 Jan 1905, notes that the dam is 50 feet high and contains 10,000 cubic yards of concrete.
  
 This is noted as a repeat order from engineer A.H. White; prior jobs have not been identified. This is noted as a repeat order from engineer A.H. White; prior jobs have not been identified.
Line 29: Line 29:
   * //Boston Evening Transcript//, 12 Aug 1904:   * //Boston Evening Transcript//, 12 Aug 1904:
 {{ :fbg-cadyville-dam-boston-evening-transcript-12-aug-1904.jpg?direct&300 |}} {{ :fbg-cadyville-dam-boston-evening-transcript-12-aug-1904.jpg?direct&300 |}}
 +
 +  * //Boston Globe//, 6 Oct 1904 (and other papers, earlier):
 +{{ :fbg-cadyville-crushing-svcs-boston-globe-6-oct-1904.jpg?direct&300 |}}
  