This is an old revision of the document!
Project 026 ◄| Project List |► Project 028
FBG Project 027
Hydropower Dam on the Saranac River
- Cadyville, NY
- 1904-05
- Engineer: A.H. White
- STANDING & IN ORIGINAL USE
This project was a tall (55-foot) concrete dam for power generation, on the Saranac River. An ad from Engineering News, 28 Dec 1905, identifies the client as International Paper Co (along with two larger jobs for that company at Piercefield, NY and Berlin, NH), but as there is no mill in Cadyville and the purpose of the dam was hydropower, this seems to be a misattribution.
An August 1904 ad in the New York Sun from FBG sought stone crushing services. Another ad [ER?], 7 Jan 1905, notes that the dam is 50 feet high and contains 10,000 cubic yards of concrete.
This is noted as a repeat order from engineer A.H. White; prior jobs have not been identified.
FBG Provenance
- Ad in System
- Ad in Engineering News
Status
- Standing and in original use (may not be producing hydropower although an apparently functional powerhouse, with power transmission cables, remains downstream).
