 ====== FBG Construction Projects ====== ====== FBG Construction Projects ======
-===== Chronological Listing [Master List] =====+===== Master Listing [Chronological] =====
  
 ---- ----
Line 6: Line 6:
 ---- ----
  
-Frank B. Gilbreth's multiple construction companies created at least 90 large-scale projects over its span of about fifteen years. This list is likely incomplete and there may be many more minor projects that have escaped discoverable records.+Frank B. Gilbreth's multiple construction companies created at least 100 large-scale projects over its span of about fifteen years. This list is likely incomplete and there may be many more minor projects that have escaped discoverable records, including six references that have not been resolved.
  
-  * //<color blue>Note: the numbering system here is completely arbitrary and used only for convenience and organization of this material. There may be any number of anomalies of actual chronology and undocumented projects.</color>//+  * //<color blue>Note: the numbering system here is completely arbitrary and used only for convenience and organization of this material. There may be any number of anomalies of actual chronology and undocumented projects. I am also attempting to reorder the projects from time to time as more accurate dates and timelines are discovered.</color>// 
 + 
 +---- 
 + 
 +<color red>**Table renumbering and restructuring in progress**. Cross-reference lists may not be fully updated. New table numbering is likely to be final, with further added entries using insert numbering.</color> 
 + 
 +^  #  ^^ Project  ^ Location  ^ Dates ^ 
 +|  U  | 000 |  //[[P000 | — Early & Unverified Projects —]]//  || 1895-1905 | 
 +|  ||||| 
 +|  S  | 001 | [[P001|Prescott Hall dormitory]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | May 1896\\ Sep 1896 | 
 +|  D  | 002 | [[P002|Webster Building]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | 1896 | 
 +|  N  | 003 | [[P003|Craigie Hall dormitory (masonry work)]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | 1897 | 
 +|  S  | 004 | [[P004|Brimmer Chambers apartments]] | [[fbglist-geo#boston, massachusetts|Boston]] | Jul 1897\\ 1898 | 
 +|  S  | 005 | [[P005|Womens' Club building]] | [[fbglist-geo#boston, massachusetts|Boston]] | Late 1898\\ 1899 | 
 +|  D  | 006 | [[P006|Boston Dispensary addition]] | [[fbglist-geo#boston, massachusetts|Boston]] | Dec 1898\\ 1899 | 
 +|  — //[[gap1899-1902 | Gap of 1899–1902]]// —  ||||| 
 +|  D  | 007 | [[P007|Power Station for Plymouth & Brockton Street Railway]] | Plymouth, MA | May 1901\\ Aug 1901 | 
 +|  D  | 008| [[P008 |Freight House for Boston & Albany RR]] | [[fbglist-geo#boston, massachusetts|Boston]] | Aug 1901 | 
 +|  D  | 009 | [[P009|Lowell Memorial Electrical Engineering Laboratory]] | [[fbglist-geo#boston, massachusetts|Boston]] | Jun 1902\\ Aug 1902 | 
 +|  D  | 010 | [[P010|Brick Chimney & Powerhouse for Cambridge Electric Light Co]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | 1902 | 
 +|  D  | 011 | [[P011|Expansion of Towns Hotel]] | Bellows Falls, VT\\ [now Rockingham] | 1902 | 
 +|  M  | 012 | [[P012|Enlarge Power Station Canal]] | Garvin’s Falls, NH | 1902 | 
 +|  U  | 013 | [[P013|Extension of Mill for Boston Manufacturing Company]] | Waltham, MA | 1902 | 
 +|  N  | 014 | [[P014|Factory for Cluett, Peabody & Co (Arrow Shirts) ]] | Leominster, MA | 1902 | 
 +|  D  | 015 | [[P015|3-story Building for Lever Brothers]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | 1903 | 
 +|  M  | 016 | [[P016|“Dove” Paper Mill for Megargee Paper Company]] | Modena, PA | Jul 1903\\ Oct 1903 | 
 +|  D  | 017 | [[P017|Warehouse for Boston Wharf Co]] | Boston | Contract Apr 1903\\ Completed Nov 1903 | 
 +|  D  | 018 | [[P018|Factory for Columbian Rope Co]] | [[fbglist-geo#auburn, new york|Auburn, NY]] | 1903-04 | 
 +|  M  | 019 | [[P019|Concrete Dam for Potter Hill Textile Mill]] | Westerley, RI | Contract July 1903 | 
 +|  D  | 020 | [[P020|Moses Taylor Hospital]] | West Seneca, NY\\ (Now Lackawanna) | Contract Oct 1903 | 
 +|  M  | 021 | [[P021|Irons & Russell Building]] | Providence, RI | Contract Oct 1903\\ Completed 1904 | 
 + 
 +=== Project Number Key === 
 +  * **S** – Standing and in original condition and use 
 +  * **M** – Standing in modified condition or use 
 +  * **N** – Standing and on National Register of Historic Places roster 
 +  * **D** – Demolished 
 +  * **U** – Unknown 
 +  * //Dates are summary and bracket the known limits of construction.// 
 + 
 +----
  
 ^ ^ Project  ^ Location  ^ Date  ^ ^ ^ Project  ^ Location  ^ Date  ^
-[[P001|001]] | //[[P001|Unknown]]// | [[fbglist-geo#auburn, new york|Auburn, NY]] | July 1895 | +**PARKING Mary Sanders [[P020x]]** 
-| [[P002|002]] | [[P002|Prescott Hall dormitory]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | Under construction May 1896\\ Occupancy by Sep 1896 | + 
-[[P003|003]] | [[P003|Webster Building]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | 1896 | +015a | [[P015a|Warehouse for Boston Wharf Co]] | Boston | Contract Apr 1903\\ Completed Nov 1903 
-| [[P004|004]] | [[P004|Craigie Hall dormitory (masonry work)]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | 1897 | +015b | [[P015b|Factory for Columbian Rope Co]] | [[fbglist-geo#auburnnew york|AuburnNY]] | 1903-04 
-| [[P005|005]] | [[P005|Brimmer Chambers apartments]] | [[fbglist-geo#boston, massachusetts|Boston]] | 1898 | +016x | [[P016x|Concrete Dam for Potter Hill Textile Mill]] | Westerley, RI | Contract July 1903 | 
-| [[P006|006]] | [[P006|Women’s Club building]] | [[fbglist-geo#boston, massachusetts|Boston]] | Contracted 1898\\ Completed 1899 | +| 017 | [[P017|Moses Taylor Hospital]] | West Seneca, NY\\ (Now Lackawanna) | Contract Oct 1903 | 
-| [[P007|007]] | [[P007|Boston Dispensary addition]] | [[fbglist-geo#boston, massachusetts|Boston]] | 1898-99 | +| 018 | [[P018|Irons & Russell Building]] | Providence, RI | Contract Oct 1903\\ Completed 1904 | 
-| — |  — //[[gap1899-1902 | Gap of 1899–1902]]// —  ||| +| 019 | See 015b ||| 
-| [[P008|008]] | [[P008|Lowell Memorial Electrical Engineering Laboratory]] | [[fbglist-geo#boston, massachusetts|Boston]] | Contract Jun 1902\\ Completed Aug 1902 + —  |  — //[[gbf1903 | Great Baltimore Fire, Feb 1903]]// —  ||| 
-[[P009|009]] | [[P009|Brick Chimney & Powerhouse for Cambridge Electric Light Co]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | 1902 | +| 020 | [[P020|Piper Building]] | [[fbglist-geo#baltimore, maryland|Baltimore, MD]] | Contract Apr 1904 | 
-| [[P010|010]] | [[P010|Expansion of Towns Hotel]] | Bellows Falls, VT\\ [now Rockingham] | 1902 | +| 021 | [[P021|3-story Warehouse for Mary Sanders ]] | [[fbglist-geo#baltimore, maryland|Baltimore, MD]] | Contract Apr 1904 | 
-| [[P011|011]] | [[P011|Enlarge Power Station Canal]] | Garvin’s Falls, NH | 1902 | +| 022 | [[P022|6-story Warehouse for John Duer & Sons]] | [[fbglist-geo#baltimore, maryland|Baltimore, MD]] | Contract May 1904 | 
-| [[P012|012]] | [[P012|Extension of Mill for Boston Manufacturing Company]] | Waltham, MA | 1902 | +| 022a | [[P022a |Powerhouse & Pumping Station for City of East Orange, NJ]] | East Orange, NJ | Contract Jun 1904 | 
-| [[P013|013]] | [[P013|Factory for Cluett, Peabody & Co (Arrow Shirts) ]] | Leominster, MA | 1902 | +| 022b | [[P022b|3-story Store for Lilly Estate]] | [[fbglist-geo#baltimore, maryland|Baltimore, MD]] | Contract Jul 1904 | 
-| [[P014|014]] | [[P014|3-story Building for Lever Brothers]] | [[fbglist-geo#cambridgemassachusetts|CambridgeMA]] | 1903 | +| 023 | [[P023|Building for DA Sargent/Normal School of Physical Education ]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | Completed Aug 1904 | 
-[[P015|015]] | [[P015|“Dove” Paper Mill for Megargee Paper Company]] | Modena, PA | Contract Mar 1903\\ Completed late 1903 | +| 024 | [[P024|Ray Memorial Building / Franklin Public Library ]] | Franklin, MA | Completed Sep 1904 | 
-| [[P016|016]] | [[P016|Concrete Dam for Potter Hill Textile Mill]] | Westerley, RI | Contract July 1903 | +| 025 | [[P025| Pumping Plant & Tanks for Boston Molasses Co ]] | [[fbglist-geo#boston, massachusetts|Boston]] | 1904 | 
-| [[P017|017]] | [[P017|Moses Taylor Hospital]] | West Seneca, NY\\ (Now Lackawanna) | Contract Oct 1903 | +| 026 | [[P026|Factory for Auburn Hame Co]] | [[fbglist-geo#auburn, new york|Auburn, NY]] | Late 1904 | 
-| [[P018|018]] | [[P018|Irons & Russell Building]] | Providence, RI | Contract Oct 1903\\ Completed 1904 | +| 026a | [[P026a|Automobile Garage for A.G. Van Nostrand ]] | [[fbglist-geo#boston, massachusetts|Boston]] | Nov 1904 | 
-| [[P019|019]] [[P019|Factory for Columbian Rope Co]] [[fbglist-geo#auburn, new york|Auburn, NY]] | 1903-04 +| 027 | [[P027|Hydropower Dam on Saranac River]] | Cadyville, NY | 1904-05 | 
-| — |  — //[[gbf1903 | Great Baltimore Fire, Feb 1903]]// —  ||| +| 028 | [[P028|Two Mercantile Buildings for Rumford Falls Power Co]] | Rumford Falls, ME | 1905 | 
-| [[P020|020]] | [[P020|Piper Building]] | [[fbglist-geo#baltimore, maryland|Baltimore, MD]] | Contract Apr 1904 | +| 029 | [[P029|4-story Mill for Walworth Manufacturing Company]] | [[[fbglist-geo#boston, massachusetts|Boston]] | < 1905 | 
-| [[P021|021]] | [[P021|3-story Warehouse]] | [[fbglist-geo#baltimore, maryland|Baltimore, MD]] | Contract Apr 1904 | +| 030 | [[P030|House & Stable for EJ Bliss]] | [[fbglist-geo#boston, massachusetts|Boston]] (Chestnut Hill) | < 1905\\ Probably 1904 | 
-| [[P022|022]] | [[P022|6-story Warehouse for John Duer & Sons]] | [[fbglist-geo#baltimore, maryland|Baltimore, MD]] | Contract May 1904 | +| 031 | [[P031|Powerhouse & Foundation for Syracuse, Rochester & Eastern RR]] | Lyons, NY | < 1905 | 
-| [[P023|023]] | [[P023|Building for DA Sargent/Normal School of Physical Education ]] | [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | Completed Aug 1904 | +| 032 | See 026a ||| 
-| [[P024|024]] | [[P024|Ray Memorial Building / Franklin Public Library ]] | Franklin, MA | Completed Sep 1904 | +| 033 | See 005 ||| 
-| [[P025|025]] | [[P025| Pumping Plant & Tanks for Boston Molasses Co ]] | [[fbglist-geo#boston, massachusetts|Boston]] | 1904 | +| 034 | See 022a ||| 
-| [[P026|026]] | [[P026|Factory for Auburn Hame Co]] | [[fbglist-geo#auburn, new york|Auburn, NY]] | Late 1904 | +| 035 | [[P035|Factory for Kursheedt Manufacturing Co]] | [[fbglist-geo#nyc, new york | Brooklyn, NY]] | Late 1904-05 | 
-| [[P027|027]] | [[P027|Hydropower Dam on Saranac River]] | Cadyville, NY | 1904-05 | +| 036 | [[P036|Project for Houghton County Street Railway]] | Houghton, MI | Early 1904 | 
-| [[P028|028]] | [[P028|Two Mercantile Buildings for Rumford Falls Power Co]] | Rumford Falls, ME | 1905 | +| 037 | [[P037|Concrete Canal for Lehigh Coal & Navigation]] | Taylorsville, PA\\ (now Washington Crossing) | 1905? | 
-| [[P029|029]] | [[P029|4-story Mill for Walworth Manufacturing Company]] | [[[fbglist-geo#boston, massachusetts|Boston]] | < 1905 | +038 | [[P038|6-story plant for John J. Latteman Shoes]] | [[fbglist-geo#nyc, new york | Brooklyn, NY]] | 1905 | 
-| [[P030|030]] | [[P030|House & Stable for EJ Bliss]] | [[fbglist-geo#boston, massachusetts|Boston]] (Chestnut Hill) | < 1905\\ Probably 1904 | +039 | [[P039|Plant for Oneida Community Company Ltd]] | Oneida, NY | Jun 1905 | 
-| [[P031|031]] | [[P031|Powerhouse & Foundation for Syracuse, Rochester & Eastern RR]] | Lyons, NY | < 1905 | +040 | [[P040|Factory & Warehouse for Walter F Lowney Co]] | Montréal, Québec, Canada | Jun-Aug 1905 | 
-| [[P032|032]] [[P032|Automobile Garage]] [[fbglist-geo#boston, massachusetts|Boston]] | < 1905 +041 | [[P041|Mill & Mill Town for St. Croix Paper Company]] | Sprague’s Falls, ME\\ (now Woodland/Baileyville) | Contract Feb 1905\\ Construction begun Mar 1905\\ Completed Dec 1905 | 
-| [[P033|033]] [[P033|7-story Dormitory]] [[fbglist-geo#cambridge, massachusetts|Cambridge, MA]] | < 1905 +042 | [[P042|Mill Buildings & Mill Town for International Paper Co]] | Piercefield, NY | ContractAug 1904\\ 1905 | 
-| [[P034|034]] [[P034|Powerhouse for City of East Orange, NJ]] East Orange, NJ | < 1905 +043 | [[P043|Dams & Powerhouse for International Paper Co]] | Berlin, NH | 1905 | 
-| [[P035|035]] | [[P035|Factory for Kursheedt Manufacturing Co]] | Brooklyn, NY | Late 1904-05 | +044 | [[P044|Rail Car Barn & Substation for NY Central Railroad]] | North Syracuse, NY | Contract May 1905 | 
-| [[P036|036]] | [[P036|Concrete Canal for Lehigh Coal & Navigation]] | Taylorsville, Pennsylvania\\ (now Washington Crossing) | 1905? | +045 | [[P045|Roper Hospital]] | Charleston, SC | Contract May 1905\\ Completion announced Feb 1906 | 
-[[P037|037]] | [[P037|6-story plant for John J. Latteman Shoes]] | Brooklyn, NY | 1905 | +046 | [[P046|Hydropower Dam for Walter Baker & Co Ltd]] | Milton, MA | Aug 1904 | 
-[[P038|038]] | [[P038|Plant for Oneida Community Company Ltd]] | Oneida, NY | Jun 1905 | +047 | [[P047|Residence for CB Alexander]] | [[fbglist-geo#nyc, new york Manhattan, NYC]] | Late 1904–05 
-[[P039|039]] | [[P039|Factory & Warehouse for Walter F Lowney Co]] | Montréal, Québec, Canada | Jun-Aug 1905 | +| 048 | [[P048|Building for Yale & Towne]] | [[fbglist-geo#stamford, connecticut | Stamford, CT]] | Apr 1905 | 
-[[P040|040]] | [[P040|Mill & Mill Town for St. Croix Paper Company]] | Sprague’s Falls, ME\\ (now Woodland/Baileyville) | Contract Feb 1905\\ Construction begun Mar 1905\\ Completed Dec 1905 | +| 049 | [[P049|Warehouses for Simmons Hardware Co]] | Sioux City, IA | Contract May 1905 | 
-[[P041|041]] | [[P041|Mill Buildings & Mill Town for International Paper Co]] | Piercefield, NY | Contract Aug 1904\\ Completed 1905 | +| 050 | [[P050|Project for Bay Road Construction Co]] | SyracuseNY 1905 
-[[P042|042]] | [[P042|Dams & Powerhouse for International Paper Co]] | Berlin, NH | 1905 | +| 050a | [[P050a|Barge Canal for Union Sulphur Co]] | Sulphur, LA | Contract Oct 1905\\ Work until Early Spring 1906\\ //Never completed by FBG// | 
-[[P043|043]] | [[P043|Rail Car Barn & Substation for NY Central Railroad]] | North Syracuse, NY | Contract May 1905 | +| 051 | [[P051|MIT Naval Engineering Building]] | [[fbglist-geo#boston, massachusetts|Boston]] | Jan-Jul 1906 | 
-[[P044|044]] | [[P044|Roper Hospital]] | Charleston, SC | Contract May 1905\\ Completion announced Feb 1906 | +| 052 | [[P052Paper Mill for Champion Fibre Co]] | Canton, NC | Contract Apr 1906\\ Completed by Jan 1907 | 
-[[P045|045]] | [[P045|Hydropower Dam for Walter Baker & Co Ltd]] | Milton, MA | August 1904 | +| 053 | [[P053|Two Buildings for Yale & Towne]] | [[fbglist-geo#stamfordconnecticut Stamford, CT]] | Apr-Jul 1906 | 
-[[P046|046]] | [[P046|Residence for C.B. Alexander]] | Manhattan, NYC | 1906? | +| 054 | [[P054|Georgetown Steam Plant (Seattle Electric Lighting Co)]] | Georgetown (Seattle), WA | Construction begun Apr 1906\\ In operation 1907 | 
-| [[P047|047]] | [[P047|Barge Canal for Union Sulphur Co]] | Sulphur, LA | Contract Oct 1905\\ //Never completed by FBG// +055 | [[P055|10-story McGraw Building (“Engineering Record“)]] | [[fbglist-geo#nyc, new york | Manhattan, NYC ]] | 1906 | 
-| [[P048|048]] | [[P048|Factory for Yale & Towne]] | [[fbglist-geo#stamford, connecticut | Stamford, CT]] | 1905 | +|  —  |  — //[[sf1906 | San Francisco Earthquake & Fire, Apr 1906]]// —  |||  
-| [[P049|049]] | [[P049|Factory for Simmons Hardware Company]] | Sioux City, IA | Contract May 1905 | +056 | [[P056|North Beach Electric Power Station for City Gas & Electric Co]] | [[fbglist-geo#san francisco, california | San Francisco]] | Contract May 1906\\ In operation Oct 1906 | 
-| [[P050|050]] | [[P050|Two Factory Buildings for Yale & Towne]] | [[fbglist-geo#stamfordconnecticut Stamford, CT]] | 1906 +057 | [[P057|Two Warehouses for Timothy Hopkins]] | [[fbglist-geo#san francisco, california | San Francisco]] | Contract Jun 1906 | 
-| [[P052|052]] | [[P052|MIT Naval Engineering Building]] | [[fbglist-geo#boston, massachusetts|Boston]] | Jan-Jul 1906 | +058 | [[P058|Three Buildings for Henry Sonntag]] | [[fbglist-geo#san francisco, california | San Francisco]] | Contract Jun 1906 | 
-| [[P053|053]] | [[P053|10-story McGraw Building (“Engineering Record“)]] | ManhattanNYC | 1906 | +| 059 | [[P059|St. Clair Building (aka Boyd Building)]] | [[fbglist-geo#san francisco, california | San Francisco]] | Contract Jun 1906\\ Completed Jul 1907 | 
-| [[P054|054]] | [[P054|Georgetown Steam Plant (Seattle Electric Lighting Co)]] | Georgetown (Seattle), WA | Construction begun Apr 1906\\ In operation 1907 | +| 060 | [[P060|Mutual Life Insurance Building]] | [[fbglist-geo#san francisco, california | San Francisco]] | Contract Sep 1906\\ 1907 | 
-| — |  //San Francisco Earthquake & Fire, Apr 1906//  ||| +| 061 | [[P061|4-story Mill for Minterburn Textile Mills]] | Rockville, CT | Contract Sep 1906\\ Construction begun Oct 1906\\ Completed early 1907 | 
-[[P055|055]] | [[P055|Mutual Life Insurance Building]] | [[fbglist-geo#san francisco, california | San Francisco]] | 1906-07 +| 062 | [[P062|Citizen’s Bank of Alameda]] | Alameda, CA | Contract Sep 1906\\ Completed Apr 1907 | 
-[[P056|056]] | [[P056|Two warehouses for Timothy Hopkins]] | [[fbglist-geo#san francisco, california | San Francisco]] | Contract Jun 1906 | +| 063 | [[P063|2-story Mill for Henry MCrane]] | Bayonne, NJ | Contract Sep 1906 | 
-[[P057|057]] | [[P057|Three Buildings for Henry Sonntag]] | [[fbglist-geo#san francisco, california | San Francisco]] | Contract Jun 1906 | +| 064 | [[P064|Mill for Champion Coated Paper Co]] | Hamilton, OH | Contract Sep 1906\\ 1907 | 
-| [[P051|051]] | [[P051|4-story Mill for Minterburn Textile Mills]] | Rockville, CT | Contract Sep 1906\\ Construction begun Oct 1906\\ Completed early 1907 | +| 065 | [[P065Forge & Machine Shop for Stayman Manufacturing Co ]] | Jersey City, NJ | Contract Sep 1906 | 
-| [[P058|058]] | [[P058|8-story StClair Building (Boyd Building)]] | [[fbglist-geo#san francisco, california San Francisco]] | Completed Jul 1907 | +| 066 | [[P0662-story Building for Stayman Manufacturing Co ]] | Jersey CityNJ Contract Oct 1906 
-| [[P059|059]] | [[P059|North Beach Electric Power Station for City Electric Co]] | [[fbglist-geo#san franciscocalifornia San Francisco]] | In operation Oct 1907 +067 | [[P067|Warehouse for BF Goodrich]] | AkronOH Contract Oct 1906\\ Completed Dec 1906 
-[[P060|060]] | [[P060|Citizen’s Bank of Alameda]] | AlamedaCA 1907 +068 | [[P068|7-story Wilson Building]] (rebuild) | [[fbglist-geo#san francisco, california | San Francisco]] | 1907-08 | 
-[[P061|061]] | [[P061|7-story Wilson Building]] (rebuild) | [[fbglist-geo#san francisco, california | San Francisco]] | 1907-08 | +069 | [[P069|Union Square Hotel]] | [[fbglist-geo#san francisco, california | San Francisco]] | Contract Jan 1907\\ Opened Jan 1908 
-[[P062|062]] | [[P062|4-story Union Square Hotel]] | [[fbglist-geo#san francisco, california | San Francisco]] | ca. 1907 | +070 | [[P070|Pacific Grand Hotel]] | [[fbglist-geo#san francisco, california | San Francisco]] | Contract Jan 1907\\ Opened July 1907 | 
-[[P063|063]] | [[P063|5-story Pacific Grand Hotel]] | [[fbglist-geo#san francisco, california | San Francisco]] | Opened July 1907 | +071 | [[P071|Plant for Pennsylvania Cement Company (?)]] | BathPA | 1907 | 
-[[P064|064]] | [[P064|Plant for Pennsylvania Cement Company]] | //Unknown// | 1907 | +072 see 007a ||| 
-| [[P065|065]] | [[P065|Mill for Champion Fibre Co]] | CantonNC Contract ca. Mar 1906\\ Completed by Jan 1907 | +073 | [[P073|Power Station for Blue Hill Street Railway]] | Canton, MA | 1907 | 
-[[P066|066]] [[P066|Mill for Champion Coated Paper Co]] | Hamilton, OH | Contract Sep 1906\\ 1907 +074 | [[P074|3-story Factory Addition for Columbian Rope Co]] | [[fbglist-geo#auburn, new york|Auburn, NY]] | Contract Apr 1907\\ Completed Dec 1907 | 
-[[P066a|066a]] | [[P066a| Foundry & Forge Shop for Stayman Manufacturing Co ]] | Jersey City, NJ | In progress Sep 1906 | +075 | [[P075|5-story Factory for S.L. Allen & Co]] | Philadelphia, PA | Contract Feb 1907 | 
-| [[P067|067]] | [[P067|Power Station for Plymouth and Brockton Street Railway]] | Plymouth, MA | 1907 | +| 076 | [[P076|Two Warehouses for New England Confectionery Co (NECCO)]] | [[fbglist-geo#boston, massachusetts|Boston]] | Contract ~Apr 1907\\ Completed ~Aug 1907 | 
-| [[P068|068]] | [[P068|Power Station for Blue Hill Street Railway]] | Canton, MA | 1907+| 077 | [[P077|Two Building Extensions for Yale & Towne]] | [[fbglist-geo#stamford, connecticut Stamford, CT]] | Contract Apr 1907 | 
-[[P069|069]] | [[P069|3-story Factory Addition for Columbian Rope Co]] | [[fbglist-geo#auburn, new york|Auburn, NY]] | 1907 | +078 | [[P078|Factory for Heywood Brothers & Wakefield Co]] | Gardner, MA | Contract Jun 1907\\ Construction Mar 1908 | 
-| [[P070|070]] | [[P070|Two Factory Extensions for Yale & Towne]] | [[fbglist-geo#stamford, connecticut | Stamford, CT]] | Contract Apr 1907 | +| 079 | See 097 ||| 
-[[P071|071]] | [[P071|5-story Factory for S.L. Allen & Co]] | Philadelphia, PA | Contract Feb 1907 | +| N-080 | [[P080 Factory for H.C. White Co]] | North Bennington, VT | May 1907\\ Oct 1907 | 
-| [[P072|072]] | [[P072|“Fenimore” Paper Mill for Union Bag and Paper Co]] | Glen’s Falls, NY | 1907+| 081 | [[P081|Can Factory for Seacoast Canning Company]] | Eastport, ME | Contract Feb 1908 | 
-| [[P073|073]] | [[P073|Factory for H.C. White Co]] | North Bennington, VT | Contract Nov 1907 | +082 | [[P082|Shoe & Leather Exposition Building]] (completion) | [[fbglist-geo#boston, massachusetts|Boston]] | Contract May 1908 | 
-[[P074|074]] | [[P074|Factory for Heywood Brothers & Wakefield Co]] | Gardner, MA | Contract Jun 1907\\ Construction Mar 1908 | + —   //— [[1909block * Projects in this block are unconfirmed and may be as early as 1904]] —//  ||| 
-| [[P075|075]] | [[P075|Can Factory for Seacoast Canning Company]] | Eastport, ME | Contract Feb 1908 | +083 | [[P083|Project for Z. & W.M. Crane Paper Co]] | [[fbglist-geo#dalton, massachusetts| Dalton, MA ]] | < 1909 | 
-[[P076|076]] | [[P076|Shoe & Leather Exposition Building]] (completion) | [[fbglist-geo#boston, massachusetts|Boston]] | Contract May 1908 | +084 | [[P084|Project for Dalton Power Co]] | [[fbglist-geo#dalton, massachusetts| Dalton, MA ]] | < 1909 | 
-[[P077|077]] | [[P077|Two Warehouses for New England Confectionery Company (NECCO)]] | [[fbglist-geo#boston, massachusetts|Boston]] | Probably 1907 (< 1909) +085 | [[P085|Project for Columbia Electric Vehicle Co]] | [[fbglist-geo#boston, massachusetts|Boston]] | < 1909 | 
-[[P078|078]] | [[P078|Project for W.M. Crane Paper Co]] | [[fbglist-geo#dalton, massachusetts| Dalton, MA ]] | < 1909 | +086 | [[P086|Project for Steam & Power Co]] | [[fbglist-geo#boston, massachusetts|Boston]] | < 1909 | 
-[[P079|079]] | [[P079|Project for Dalton Power Co]] | [[fbglist-geo#dalton, massachusetts| Dalton, MA ]] | < 1909 | +087 | [[P087|Project for the Lowell Bleachery Co]] | Lowell, MA | < 1909 | 
-[[P080|080]] | [[P080|Project for Columbia Electric Vehicle Co]] | [[fbglist-geo#boston, massachusetts|Boston]] | < 1909 | +088 See 049a ||| 
-[[P081|081]] | [[P081|Project for Boston Steam & Power Co]] | [[fbglist-geo#boston, massachusetts|Boston]] | < 1909 | +089 | [[P089|Paper mill for H.G. Lowe Paper]] | Ridgefield, NJ | < 1909 | 
-[[P082|082]] | [[P082|Project for the Lowell Bleachery Co]] | Lowell, MA | < 1909 | +090 | [[P090|1-story Cotton Mill Extension for H.E. Danner Textile Co]] | Paterson, NJ | Contract Jul 1908\\ Construction begun Dec 1908\\ Completed early 1909 | 
-[[P083|083]] [[P083|Project for Houghton County Street Railway]] | Houghton, MI | < 1909 +091 | [[P091|Box Plant for Atwood-McManus Co]] (reconstruction) | Chelsea, MA | Dec 1908-Mar 1909 | 
-[[P084|084]] | [[P084|Project for Bay Road Construction Co]] | Syracuse, NY | < 1909 | +092 | [[P092|Hydroelectric Powerhouse for Grand Falls Power Co]] | Grand Falls, NB/ME\\ (international river border) | Contract Mar 1909\\ //Never completed// | 
-| [[P085|085]] | [[P085|Paper mill for H.G. Lowe Paper]] | Ridgefield, New Jersey | < 1909 | +| 092a| [[P092aFishing Pier for H.F. Kean]] | Sandy Hook, NJ | Mar-Apr 1909 | 
-[[P086|086]] | [[P086|1-story Extension to Cotton Mill for H.E. Danner Textile Co]] | Paterson, New Jersey | Contract Jul 1908\\ Construction begun Dec 1908\\ Probably completed Feb 1909 | +| 092b| [[P092b| Frost Building]] | Plainfield, NJ | Contract Sep 1909\\ Completed Jan 1910 | 
-[[P087|087]] | [[P087|Box Plant for Atwood-McManus Co]] (reconstruction) | [[LOCchelseama|Chelsea, MA]] | Dec 1908-Mar 1909 | +| 093 | [[P093|Ransom Hollow Dam & Powerhouse for Warren County Power Co]] | Columbia, NJ | Contract Oct 1909 | 
-[[P088|088]] | [[P088|Hydroelectric Powerhouse for Grand Falls Power Co]] | Grand Falls, NB/ME\\ (international river border) | Contract Mar 1909\\ //Never completed// | +094 | [[P094|Ransom Hollow Dam & Powerhouse]] | Creighton, GA | Contract Feb 1910 | 
-| [[P089|089]] | [[P089|Ransom Hollow Dam & Powerhouse for Warren County Power Co]] | Columbia, New Jersey | Contract Oct 1909 | +095 | [[P095| 4-story Apartment Building for Isaac Wrubel ]] | Paterson, NJ | Contract Feb 1910, Completed 1910 | 
-[[P090|090]] | [[P090|Ransom Hollow Dam & Powerhouse]] | Creighton, GA | Contract Feb 1910 | +096 | [[P096|Paper Mill for Union Bag & Paper Co]] | Trois-Rivières, Québec, Canada | Contract Sep 1910\\ In service early 1912 
-[[P090a|090a]] | [[P090a | 4-story Apartment Building for Isaac Wrubel ]] | Paterson, NJ | Contract Feb 1910 | +| 097 | [[P097| Addition to “Fenimore” Paper Mill for Union Bag & Paper Co]] | Glen’s Falls, NY | Contract Feb 1911\\ Completed Jun 1911 |
-[[P091|091]] | [[P091|Paper Mill for Union Bag & Paper Co]] | Trois-Rivières, Québec, Canada | Contract Sep 1910\\ In service early 1912 |+
  
  
fbglist-chrono.txt · Last modified: 2023/12/10 19:39 by therblig